Home / Topics / A 5 km stone wall on the El Dabaa high-speed rail

Topic

A 5 km stone wall on the El Dabaa high-speed rail

Double-face debsh wall works for the national high-speed rail project at El Dabaa.

A 5 km stone wall on the El Dabaa high-speed rail

The El Dabaa high-speed rail double stone wall is one of GA One’s infrastructure references. The wall is 5 kilometres, double face, in debsh stone, on the North Coast.

Project facts

Scope that was carried

Site preparation and excavation, supply and installation of natural stone, a durable double-face wall, retaining and boundary wall works, compliance with railway safety and quality standards, and coordination with the main contractor and the engineering consultant.

The same stone skill shows up in smaller boundary and facade work. The rail wall is the large proof of length and specification.

Why the length matters

Five kilometres of double-face wall is not a short boundary. It needs site preparation, a steady supply of natural stone, a section that holds as a retaining and boundary wall, and daily coordination with the main contractor and the engineering consultant under railway safety rules. Owners who need a shorter debsh wall, a facade or landscaping stone can use the same trade at a smaller scale and say so on the form.