
Reinforced concrete for hospitals and resorts on the Red Sea
Coastal concrete work has to stay accurate in heat, wind and tight resort programmes. Foundations, columns, slabs and basements are priced from the drawings, the soil report and the pour sequence.

Turnkey hotel and resort construction
Resort work on the Red Sea is a set of buildings, pools and dates that have to land together. One contractor can hold the structure, the buildings and the pools instead of splitting every trade.

Swimming pool construction for coastal resorts
Four pools at Sunrise Resort sat beside the hotel buildings, not as a separate afterthought. The price follows the number and size of pools, the structure around them, and access on the coast.

A 5 km stone wall on the El Dabaa high-speed rail
National rail work asks for length, safety rules and coordination with the main contractor. The El Dabaa wall is 5,000 metres of double-face debsh, in two layers, on the North Coast.

Flood drainage channels for exposed sites
Red Sea and North Coast sites need a path for sudden water, not only a building contract. A channel is priced from its length, its section and how plant reaches it.

Finishing works for tourism buildings
Finishing is where a resort building becomes ready for guests, and it needs a dry, stable structure first. Plaster, paint, tile and decoration follow the frame, and stone facades can be priced beside them.

Pump rooms, water tanks and lifting stations
A resort or a plant still needs water in and sewage out. Pump rooms, tanks and lifting stations are priced on their own, from the number of rooms and how the site is reached.

Subcontracting and joint ventures with GA One
A clear scope, a location and a stage are enough to start. Drawings can follow. Owners, developers and main contractors can ask for a quote, a subcontract, a joint venture or a supply cooperation.