Swimming pools on a resort are tied to the same programme as the buildings around them. Levels, access for plant and the handover date all move together.
How GA One has done it
At Sunrise Resort the scope listed four swimming pools together with three hotel residential buildings and the Royal Building. That is the pattern the company prices: pools as part of the resort, with concrete and building crews already on the coast.
What affects the price
- Number and size of pools
- Whether the structure around them is in the same contract
- Access on the Red Sea coast and the stage of the project
If the pools are a subcontract under a main contractor, choose “Subcontracting opportunity” on the inquiry form and attach the bill or the drawings.
With the rest of the resort
Sunrise listed the four pools in the same scope as three hotel residential buildings and the Royal Building, for Sunrise (Red Sea Hotels) on the Red Sea coast. That is easier to build than a pool added after the hotel is occupied: plant access, levels and the handover date stay in one programme. If the tanks or pump room that feed the pools are also in the civil scope, name them in the same inquiry so the mobilisation is not repeated.